This converter (we are keeping them anonymous at their request) runs eight CI presses across two facilities. They had grown 30% over five years, and their mounting room was the bottleneck holding back further growth.
The problem they couldn't ignore
Press utilization had dropped from 78% to 64% even though demand was up. Their analysis pointed to changeover time and prepress flow as the primary causes. Sleeve damage was running at $180,000 per year. They had stopped tracking it because the number was too depressing.
The 90-day plan
We started with a Snapshot — an onsite walk-through with their leadership team. The output was a prioritized list of changes with rough ROI for each. They picked the top three.
- Replace the static sleeve shelving with a mobile SleevePodz system sized for current inventory plus 30% growth.
- Migrate plate inventory from cardboard boxes to a PlatePodz flat-box system co-located with mounting.
- Standardize cart-based job staging so every changeover started with a complete job kit.
Implementation
Install was sequenced over 14 weekends to avoid any production impact. Operators were trained on the new system in two-hour shifts. Total project duration: 90 days from contract signature to full operation.
The results at 12 months
- Press utilization back to 81% — better than the historical high.
- Sleeve damage cost: $22,000 (an 88% reduction).
- Average changeover time: down 28%.
- Floor space reclaimed: ~900 sq ft, repurposed for QA staging.
The takeaway
Mounting room investment is not glamorous. But the ROI is among the cleanest capital decisions a converter can make.